Processing

Montape-Verarbeitung

1. AFFIX
Peel off the silicone foil from the underside of the Montape®. Evenly affix the sealing tape with the adhesive side centred onto C / U section.

2. UNFOLDING
Unfold the Montape® dividing strips and evenly press and smooth down along the edges of the section.

3. MOUNTING
Fix the bonded C / U section onto the wall / ceiling / floor. Mount the gypsum / fibreboard with at least 3-5 mm gap to the Montape® divider strips and fill the joints professionally.

4. CUTTING
Cut off the Montape® PE-divider strips after completion of the filling work.

5. COMPLETED
Flawless standard and vendor compliant connection joint.

To achieve a flawless connection joint with MONTAPE®, every work step must be carried out precisely and accurately.